Claim 920453d9Checked 21 Jul 2026
TrueOn the truth scale
“The previous Government shelved plans to unblock the bottleneck at East Croydon station.”
—Natasha IronsLabourLab / Croydon East·Engagements·03 Jun 2026Factual · historical current chronological
Reasoning & Evidence21 Jul 2026
Based on the evidence, the claim is well-supported. Multiple authoritative sources confirm that the previous (Conservative) government cancelled or paused the Croydon Area Remodelling Scheme (CARS), which was designed to address the bottleneck at East Croydon station.
**Key findings:**
1. **Network Rail's own website** states: "The Brighton Mainline Upgrade Programme, which comprise the Croydon Area Remodelling Scheme (CARS)… was paused in 2022 at Outline Business Case stage by the previous government. No further development work has taken place since this point, and the programme is not currently funded."
2. **Transport Minister Simon Lightwood** confirmed in a March 2026 Westminster Hall debate (secured by Natasha Irons herself): "In response, the previous Government took the decision to cancel the scheme at the 2021 spending review, although regrettably that decision was never actually formally communicated to stakeholders. No further development work has taken place on CARS since then."
3. **BBC News** reported: "Transport Minister Simon Lightwood confirmed the project had been paused by the previous government in 2022 without notifying stakeholders, and has not been reinstated in subsequent spending reviews."
4. The CARS scheme was specifically designed to address the bottleneck at East Croydon, including expanding the station from six to eight platforms, redesigning track layout in the Selhurst triangle, and removing conflicting train movements.
The claim that "the previous Government shelved plans to unblock the bottleneck at East Croydon station" is accurate. The previous government cancelled CARS at the 2021 spending review (with Network Rail describing it as paused in 2022), and no development work has occurred since. The word "shelved" is an accurate characterisation of both "cancelled" and "paused."
Sources:
- Network Rail – Brighton Main Line upgrade proposals (https://www.networkrail.co.uk/our-work/our-routes/sussex/brighton-main-line-upgrade-proposals/)
- BBC News – Croydon rail upgrade delay may impact Gatwick and Universal, says MP (https://www.bbc.co.uk/news/articles/c8x7l992k7wo)
- TheyWorkForYou – Westminster Hall debate on Croydon Area Remodelling Scheme, 17 March 2026 (https://www.theyworkforyou.com/whall/?id=2026-03-17c.253.0)
- New Civil Engineer – MPs demand revival of Croydon rail overhaul (https://www.newcivilengineer.com/latest/mps-demand-revival-of-croydon-rail-overhaul-due-to-fundamental-link-with-gatwick-expansion-24-03-2026/)
From speech
Q3. I am proud that, after decades, this Labour Government are putting passengers before profit by bringing Greater Thameslink Railway, Southern and Gatwick Express into public ownership. The previous Government shelved plans to unblock the bottleneck at East Croydon station, which not only causes delays from Bedford to Brighton, but leaves constituents at Norwood Junction station in limbo. Will the Prime Minister look again at the Croydon area remodelling scheme and back my campaign to unblock the Croydon bottleneck? Does he agree that, by bringing our railways back into public hands, this Government are getting us back on track?
Sources opened
| [1] | bbc.co.uk |
| [2] | parallelparliament.co.uk |
| [3] | bbc.com |
| [4] | theyworkforyou.com |
| [5] | newcivilengineer.com |
| [6] | networkrail.co.uk |
| [7] | mylondon.news |